Cherry Cruck Frame Pavillion

After two intense months of laying out and cutting this frame we raised it by hand with the help of the Mullen family of Rockbridge County, Virginia. A lovely day in May in Maryland.

img_2851

Early setup.

img_2859

A-frames raised.

img_2862

First wall up.

img_2868

Second one in due time.

img_2872

Raising the first of the awkward to handle cruck blades. There is an extension to the boom, that just reached far enough.

img_2874

First rafter ready.

img_2877

End of raising day one

img_2885

Raising the paulownia cruck.

img_2887

Setting the last rafters.

2016-06-24-15-12-53

The rough frame. Oiled and rained on.

2016-06-24-15-25-39 2016-06-24-15-26-59

The cherry cruck in the front.

2016-06-24-16-37-06 2016-06-24-15-21-34

The Paulownia cruck in the rear.

10_1_16_s

Roofed and with glass in the gable. Deck being trimmed.

img_2891

A bit out of order and a year and a half late. This is the happy core crew with Vicco taking the picture.

Truly the most beautiful structure I’ve been so intimatiely involvied with creating.

Gratitude.



Comments are closed.