A counter for the Grace

IMGP0793

The cooler that is currently creating the coffee counter is on its last legs and needs to be replaced before the summer.

IMGP0799

And as different functions were added over the years, the old counter grew organically.

Grace counter revised

A new cooler needs a new counter, which is an opportunity to reorganize just a little bit. But keeping all the elements, of course. Maybe adding a thing or two…

IMGP0858 IMGP0856

First things first: the backbone of the counter.

A laminated wooden top.

IMGP0863 IMGP0866

Then the cabinets that will support the big coffee machine and ice box and all.

IMGP0872 IMGP0874

Nice and sturdy.

IMGP0875

A shiny stainless steel countertop piece to keep things neat. With expert help from Cutting Edge Metals right here in Duluth.

IMGP0878

By now the cabinets are all together…

IMGP0877

… and test fitted.

IMGP0881

A few more coats of varnish where it matters.

IMGP0898

Then the cabinets are ready for final assembly at the Grace.

IMGP0902

The new countertop is just narrow enough to fit through the railing.

IMGP0903

IMGP0905

Things go together fast in the morning and the new cooler is already in , but not leveled out yet.

IMGP0907IMGP0908

The ice box is heavy and awkward even when empty. But with a little bit of ingenuity it’s in place.

IMGP0912

At the end of the first shift it already looks to be well at home.

IMGP0913

With some things still finding their place. And a punch list. Of course.